Why Permits Matter
A permit is not bureaucracy; it is the record that your renovation was built to code and inspected. Skip it and you risk safety, insurance coverage, and a sale-killing disclosure problem years later.
What Typically Requires a Permit
- Moving or adding plumbing, electrical, or gas lines.
- Structural changes — removing walls, adding windows, bump-outs, additions.
- Roof replacement and significant exterior work.
- Basement finishing and new egress.
What Usually Does Not
Cosmetic updates — painting, cabinet door swaps, flooring replacement, light fixture swaps — typically do not require a permit, though local rules vary.
How Cranberry Township Handles It
Cranberry Township requires a building permit for the work above, with plan submission, permit fees, and inspections at rough-in and final. Surrounding municipalities (Mars, Seven Fields, Evans City) follow similar processes under the Uniform Construction Code.
We pull and manage every permit for our clients. You never deal with the township directly — and your project stays legal, inspectable, and saleable.
The Risk of Skipping
Unpermitted work shows up on a future title search or buyer's inspection. At best, you re-do the work; at worst, a sale falls through. Build it right, build it legal, from day one.

